BOBO,强行漂亮老师做爰2,小婕子教我做爰-小婕子教我做爰,お母さん爱してるよ歌词翻译,绝美儿媳妇林曼晏

Welcome to Luotian MinTai Stone Col.,Ltd.
  • E-Mail:1013992589@qq.com Hot-Tel:18060329133/18120325888/18371383699
  • 简体中文
  • ENGLISH
  • Stone Knowledge

    Stone processing needs to pay attention to what
      Source       Views 966       Time 2019/12/12 05:27:37

    How to supply high-quality stone for construction projects?, can start from the following six aspects, from the beginning of the selection of materials to the final packaging disposal, are not negligence.

    One, material selection

    Before sealing the stone samples, communicate with the designer according to the requirements of the stone consumption of the project and the action diagram, and deliver the samples corresponding to the requirements.After sealing the sample, according to the end of the customer needs to choose the requirements of the mine to choose the same hole to choose the raw materials, in order to produce.All wastes are numbered in the mine and put into storage.

    Two, raw material cut

    After the waste is expected to plant, there will be waste material inspector to participate in the waste material to make the beginning of the evaluation, according to the pattern, stone classification number storage, and according to the waste material standards to give the cut proposal, as far as possible to improve the utilization rate.

    The sand saw and disk saw workshop will select the appropriate material number of the detailed items according to the opening statement of the material class, and then collect the material according to the number, and then organize the cutting of the material.After cutting the same raw material according to the "raw material number + plate number" pattern to each plate number.After the second inspection by the inspector, make the big board storage list.Such a number check method, can ensure that the stone in the same area to choose the same area and even the same waste material, in the future the same project demand to make up the supply of time can also be based on the large plate number to find color stone near the large plate;

    Three, plate cut

    The control of color and quality in the bridge cutting workshop is primarily reflected in the process of processing, before doing the standard cutting processing, will do a full inspection of the stone to be cut, about the crack line, stone gallbladder some reasonable escape, as far as possible progress rate of finished products;

    4. Protection and disposal

    Imported sikang protective agent is selected for protective treatment, which can be divided into oil and water.Usually for 6 sides 3-5 times more than repeated brushing method.

    Five, typesetting inspection

    All the data board equipment before, will be in the factory "rehearsal".In the natural light, ensure the color uniformity natural;

    Vi. Numbered package

    According to the layout function, the packers will number the qualified products according to the direction of the device through protective disposal and plate inspection, and attach two or more plate diagrams to the outer packing boxes.

    中真的有用吗| 瓦尔加| ]的英语发音| office2018破解版| 不灵不灵| 金价还能跌回500以下吗| 欧美50大成人艳星| 人野兽马狗猪大全| 妖精的尾巴第一季| 我把刘姨俩腿扛在肩上是哪一集的| 射雕英雄传李亚鹏| 《你邻居的妻子》电视剧| 媒有作宇赠设电居| 亲吻姐姐| 八下话交人我板电子书| 免费观看已满十八岁电视剧直播| 进口报关| dessmann| 天地男儿| 江苏省淮安市| 高铁为什么从480变成了350| 爱上露出| 吸血鬼仆人动瀑免费观看| 马蕲空| 中国唱班诗班免费观石| 空姐少女正版2| 最长寿命的人是多少岁| 海怪玛雅| 免费流行歌曲500首播放| 陪坊女人| 密使2之江都谍影 电视剧| 酸峰对决| me before you| 顶楼的大象| 男男激情video欧美猛男 | 环保部部长| 十六年前的回忆课文朗读视频